How to Build a Screened In Patio.Patio overview. However much you love your patio, there may be just too many days when its not fit to live on.Our enclosure turns a patioor a deckinto a space as comfortable as another room of your house.Of course, it wont keep out the cold, but the roll down shades will block out most of the rain.And, thanks to the screens and the awning soffit Photo 1.Our 1. 4 x 1. 6 ft.Local/AU/Product%20Images/Lockwood/Sliding%20Door%20Tracks/OTL2000BLK_LW_EN_I6.jpg' alt='Installing A Turnbuckle On A Screen Door' title='Installing A Turnbuckle On A Screen Door' />Although its fairly simple structurally, it requires careful work with a lot of large dimension lumber.The trickiest part is getting all these components square and plumb, which probably calls for more than a beginners skills.And youll spend a lot of time buildingtwo or three weeks going at it full time, or much of a summer in your spare time.We built our roof high enough to preserve a pleasant view through the sliding doors.In summer, the awning top shades the bright sun, yet allows plenty of light to pass into the house.And heres the biggest selling point for this project You can easily remove the awning in winter and let the sunshine in.The structure is designed to look good even without the awning top.Of course, you could leave the awning on all year in many parts of the country, but it wont support a heavy snow load.The awning is attached as shown in Fig.E and Photos 1. 5 and 1.A slide in channel at the peak and turnbuckle clips along the edges make for a quick, no hassle on and off in spring and fall.The approximately 1.Www. priefert. com 8005278616.Horse Panel Walker.Installation Instructions.HWP8v2a0212. Www.Horse Panel Walker Installation Instructions HWP4v30611.Tseries FAQ list.The MG TSeries. In 1936 the MG Car Company made a dramatic change in the design of their sports cars.In this year they introduced the MGTA Midget.This soil screener features springs and hinges made from old car tires so there is no need for regular steel springs and metal hinges and the major hassle mounting.We had our awning top made by a professional awning maker, who also handled the initial installation.As an alternative, you can also consider metal or plastic roof panels, which are sold at most home centers.Before beginning any work, be sure to have your local building inspector look at your plans.Your town may have special requirements for a structure such as this, and will probably require a building permit and inspection.Your inspector may also require the enclosure to be checked by a structural engineer.Even if its not required, the cost of an inspection is a worthwhile investment in peace of mind.NOTE Building codes in some regions require additional seismic and highwind anchors.Ask your building inspector about local requirements.For a furniture quality interior, use D grade nearly blemish free cedar for the entire structural framework, with the exception of the laminated 1 34 x 1.Photos 5 and 6 at the peak.You can substitute treated lumber for the framework, which will cut costs substantially, though the wood will show some imperfections.The foundation timbers are pressure treated 6x.Bolts, screws, door hardware, paint and other miscellaneous hardware will add several hundred dollars to the cost.We first painted our enclosure with a stain blocking primer coatmake sure the label says that the product blocks cedar stainsto seal the cedar so it doesnt discolor.We followed that with a topcoat of white latex paint.Do your painting before mounting the screens and doors.NOTE If you choose not to paint, youll probably want to have your screens made of bronze colored aluminum frames rather than white.Measure for the screens after the structure is completed.Buy custom made screens for the enclosure and the doors, or make your own.If you live in the Sun Belt, you might want to consider using a sun blocking screening material available at some home centers or online.As an alternative to custom made screens, you might want to consider securing the screening directly to the framing.However, this system does not allow the screens to be taken down and put back up easily.The total cost for our patio enclosure will range from several thousand if you use less expensive materials to two or three times that amount or more for premium lumber and professionally made screens.Figure A Foundation and Post Layout.Adapt this 1. 4 ft.For a large, printable version, see Additional Information, below.Foundation plan. Figure B Screened Patio Overview.This cutaway diagram explains the framing details.For a large, printable version, see Additional Information, below.Framing details. Laying the foundation.Photo 1 Establish the perimeter lines.Lay out the perimeter lines of the enclosure with masons string for the outside of the foundation timbers Photo 3.Check the layout for squareness Diagonal measurements should be equal.Photo 2 Remove the pavers.Remove the pavers to a width of about 1 ft.Stack the pavers neatly so you can later cut and replace them in the same slots.Then dig a trench 8 in.Level the gravel and tamp it smooth.Photo 3 Set the timbers on the gravel.Lay 66 treated. Level the timbers if necessary by adding or removing gravel.Predrill holes, and nail the timber corners together with 1.Cut the pavers with a masonry wet saw and reinstall them so they fit tight against the timbers.The paver patio on which we built our enclosure was already in place, and we designed the enclosure to accommodate its shape.We extended one corner into the circular planting bed, as shown in Photo 1.For paver installation how to, see Build a Stone Patio or Brick Patio.Lay out the perimeter lines with masons string.Make sure the perimeter is square by measuring diagonally from corner to corner in both directions.The diagonals should be equal.We then removed the pavers along the entire patio enclosure perimeter Photo 2, and dug a trench 8 in.Fill the trench with crushed gravel of 38 in.To accommodate any slope in the patio, level the gravel so that the foundation timbers will sit about 12 in.Since our 66 foundation timbers Photo 3 rest directly on the ground, we bought pressure treated timbers with a higher.The structure of our enclosure is not attached to the house anywhere it is supported entirely by the foundation timbers.This exempts the entire structure from the more stringent building code requirements that would otherwise apply.However, its important to firmly embed the foundation timbers in gravel and on top of soil that wont sink, compact or suffer severe frost heave.After the foundation timbers were level and securely in place, we replaced the pavers, cutting them with a masonry wet saw available at most tool rental outlets to fit tightly against the foundation timbers.Fitting the pavers tightly anchors the timbers against shifting.Assembling the framework.Photo 4 Notch the vertical posts.Mark and notch all the vertical posts into which the horizontal framing cross members fit.Cut as much as possible with a circular saw, then complete the cuts with a handsaw.For the notches that receive the intermediate horizontal 2x. Free Download Stellar Phoenix Data Recovery With Crack more. Photo 5 Install the rear posts.Mount the laminated peak beam to the two rear posts with lag bolts, then raise the assembly into place.Strips of 12 in. Secure the assembly temporarily with two diagonal braces.Photo 6 Install the front corners Install the front corner posts and secure them with temporary diagonal bracing.Then fit the upper horizontal 2x.Measure diagonally from corner to corner on all four sides, and move the temporary bracing as necessary to ensure that all the sides are square, and all posts plumb.Photo 7 Cut the side posts.Place the intermediate side posts temporarily with one screw, letting them run long.Then temporarily place an end rafter that has a birds mouth notch, and mark the posts for cutoff flush with the top of the rafter.Take the posts down and cut them to length.Photo 8 Bolt the frame together.Lag bolt all the framing members securely together with two 38 in.Predrill 31. 6 in.Countersink the washers and bolt heads.Begin your framework assembly by notching all the 66 and 46 vertical posts to receive the horizontal framing members Photo 4 and Fig.C. Mark the position for all the vertical posts on the foundation timbers.Drill 12 in. holes in the bottom of each post and corresponding holes in the timbers for drift pins Fig.A. These pins, cut from 12 in.To obtain the necessary span strength, we used a pressure treated 1 34 x 1.Photo 5, which youll probably have to special order at a full service lumberyard.Mount the laminated beam to the notches in the two rear vertical posts with lag bolts.Use washers, and countersink the washers and the lag bolt heads.Tack sill seal12 in.Then raise the assembly in place, dropping the posts onto the drift pins.Hold the posts in place with temporary 24 diagonal braces.Raise the two front corner posts into position, fitting them onto the drift pins.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. Archives
November 2017
Categories |